Skip navigation
Please use this identifier to cite or link to this item: http://repositorio.unb.br/handle/10482/55611
Files in This Item:
There are no files associated with this item.
Title: Análise das atualizações dos sistemas prediais elétricos e de climatização em um CAIC – edifício escolar pré-fabricado
Other Titles: Analysis of updates to electrical and air conditioning buildingsystems in CAIC – prefabricated school building
Authors: Montanine, Gabriel Lopes
Zanoni, Vanda Alice Garcia
metadata.dc.identifier.orcid: https://orcid.org/0009-0009-5708-6435
https://orcid.org/0000-0003-2629-4214
metadata.dc.contributor.affiliation: Universidade de Brasília, Faculdade de Arquitetura e Urbanismo, Programa de Pós-Graduação
Universidade de Brasília, Faculdade de Arquitetura e Urbanismo, Departamento de Tecnologia
Assunto:: Edifícios
Adaptabilidade
Obsolescência funcional
Patrimônio moderno
Issue Date: Oct-2025
Publisher: ANTAC
Citation: MONTANINE, Gabriel Lopes; ZANONI, Vanda Alice Garcia. Análise das atualizações dos sistemas prediais elétricos e de climatização em um CAIC – edifício escolar pré-fabricado. SIMPÓSIO NACIONAL DE SISTEMAS PREDIAIS, Porto Alegre, v. 4, e8158, 2025. DOI: 10.46421/sispred.v4.8158. Disponível em: https://eventos.antac.org.br/sispred/article/view/8158. Acesso em: 10 ago. 2026.
Abstract: One of the discussions surrounding the conservation of modernist buildings relates to the obsolescence oftheir electrical and air conditioning systems. Updating these systems is essential to ensure that the building ́sfunctionality and meet contemporary usage requeriments, without compromising its essential architecturalattributes. Adaptability, in the context of prefabricated buildings, involves understanding the complexity anduniqueness of their components. Currently, the Comprehensive Care Centers for Children and Adolescents(CAICs), a project developed by João Filgueiras Lima, face these questions, especially because of the electricalequipament and components attached to the prefabricated elements. The objective of this article is toanalyze the adjustments adopted in the processes of updating the electrical and air conditioning systems of aCAIC, currently occupied by UEG Laranjeiras, located in the city of Goiânia. A building inspection was carriedout thought surveys and photographic records. The results highlight the technical solutions employed andthe difficulties faced during the updating of these systems. Some interventions affected the originalprefabricated elements, highlighting the difficulty of replacing parts with similar performance andcharacteristics. It is concluded that most of the solutions adopted are reversible and do not affect theessential attributes of the modernist building.
metadata.dc.description.unidade: Faculdade de Arquitetura e Urbanismo (FAU)
Departamento de Tecnologia em Arquitetura e Urbanismo (FAU TEC)
metadata.dc.description.ppg: Programa de Pós-Graduação em Arquitetura e Urbanismo
DOI: https://doi.org/10.46421/sispred.v4.8158
metadata.dc.relation.publisherversion: https://eventos.antac.org.br/sispred/article/view/8158
Appears in Collections:Trabalhos apresentados em evento

Show full item record " class="statisticsLink btn btn-primary" href="/handle/10482/55611/statistics">



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.