| Título: | Planejamento logístico integrado aplicado à programação de obras de infraestrutura de transportes |
| Outros títulos: | Integrated logistic planning applied to transport infrastructure scheduling |
| Autor(es): | Vieira, Marcello da Costa |
| E-mail do autor: | marcelloeng93@gmail.com |
| Orientador(es): | Garcia, Reinaldo Crispiniano |
| Assunto: | Logística Obras de infraestrutura Planejamento de tempo |
| Data de publicação: | 30-mar-2020 |
| Data de defesa: | 2-jul-2019 |
| Referência: | VIEIRA, Marcello da Costa. Planejamento logístico integrado aplicado à programação de obras de infraestrutura de transportes. 2019. xiv, 181 f., il. Tese (Doutorado em Transportes)—Universidade de Brasília, Brasília, 2019. |
| Abstract: | Under a systemic point of view, a construction work is a linked (productive) construction process that has as its final product a building, a highway, a bridge, etc. The construction project’s successful outcome consists in being able to integrate the supply sources’ outputs planning with the work execution plan in order to reduce the uncertainties. The integration and coordination of these two actions, logistics and production, depends on the modeling of three systems: the logistics system of external supply of products to the storage areas of plants and construction sites (supply chain); the internal logistic system of supply to the plants and from these to the different work fronts (production chain) and; the internal logistic system of supply to the construction sites and from this to the work fronts (distribution chain). The traditional construction planning methodology ignore the processes of multiple feedbacks, nonlinear relationships between activities and the material and inputs’ processes, different production units and storage areas. Therefore, development and a new time’s planning methodology is required to allow duration estimates of infrastructure projects. In this research it was proposed a simulation model based on an integrated logistics system, structured in six subsystems: data’s collection and preparation, logistic network’s design, data entry, simulation, data output and experimental designs. The AnyLogic software was chosen as a platform to implement the simulation model because it allows the use of Agent Based Simulation. The development of the present work has shown that it is possible, under the systemic view of Logistics in conjunction with other knowledge sciences such as Operational Research and Multiagent Simulation, to develop a new integrated logistics planning methodology for transport infrastructure projects that allows the achievement of success in these projects. |
| Unidade Acadêmica: | Faculdade de Tecnologia (FT) Departamento de Engenharia Civil e Ambiental (FT ENC) |
| Informações adicionais: | Tese (doutorado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Civil e Ambiental, 2019 |
| Programa de pós-graduação: | Programa de Pós-Graduação em Transportes |
| Licença: | A concessão da licença deste item refere-se ao termo de autorização impresso assinado pelo autor com as seguintes condições:Na qualidade de titular dos direitos de autor da publicação, autorizo a Universidade de Brasília e o IBICT a disponibilizar por meio dos sites www.bce.unb.br, www.ibict.br, http://hercules.vtls.com/cgi-bin/ndltd/chameleon?lng=pt&skin=ndltd sem ressarcimento dos direitos autorais, de acordo com a Lei nº 9610/98, o texto integral da obra disponibilizada, conforme permissões assinaladas, para fins de leitura, impressão e/ou download, a título de divulgação da produção científica brasileira, a partir desta data. |
| Aparece nas coleções: | Teses, dissertações e produtos pós-doutorado |
Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.